Submitted by Moondance on Thu, 01/06/2011 - 22:48
Complete log joint installed and finished w/ tung oil.
Drilling center hole
Hammering all thread into hole
Setting log in place
Setting log plumb
Using the scribe
Lines drawn by scribe
Grinding
Joining the logs
Post & beam joint complete
Installing vega with post attached.

Posts and vegas in place at future kitchen snack bar.

